Designation | 36798 / 10035D |
Launch date | 12 Jul 2010 |
Country of origin | Algeria |
Mission | Remote sensing |
Perigee/Apogee | 633 km, sunsynchronous |
Inclination | 98.2° |
Period | 98.2 min (4 days revisit) |
Launch vehicle | PSLV #17 |
Prime contractor | Astrium |
Platform | AstroSat100 (Myriade) |
Mass at launch | 116 kg |
Dry mass | |
Dimension | |
Solar array | |
Stabilization | 3-axis |
DC power | |
Design lifetime |