Gsat 1



General


Designation 26745 / 01015A
Launch date 18 Apr 2001
Country of origin India
Mission Technology
Geostationary orbit should have gone to 48°E
Launch vehicle GSLV #1
Launch site Sriharikota

The satellite was not placed in the perfect orbit. Moreover an inequal filling of the fuel tanks caused the satellite to tilt, which caused the satellite to use all its fuel to try and stabilize it. Therefore a GEO orbit could not be reached and the satellite is used for a few communication experiments, but nothing useful.

The first flight of GSLV costed Rs 11.05 billion The second launch pad was being built at a cost of Rs 2.89 billion.

Aimed at demonstrating advanced communication technologies such as digital audio, data and video broadcasting.

External resources


sat-index articles


Technical data



Specifications


Prime contractor  
Platform  
Mass at launch 1540 kg
Mass in orbit  
Dimension  
Solar array  
Stabilization  
DC power  
Design lifetime 3 years

Has a 440 N ISRO liquid apogee motor.

S-band


Main transponders
Backup transponders  
Power 140 W
Bandwidth  
Coverage  
EIRP max  
G/T max  
Polarization  


C-band


Main transponders
Backup transponders  
Power 140 W
Bandwidth  
Coverage  
EIRP max  
G/T max  
Polarization  


© TBS Internet, all rights reserved. All reproduction, copy or mirroring prohibited. Legal notice
francais anglais contact