Designation | 35362 / 09032A |
Launch date | 21 Jun 2009 |
Country of origin | Malaysia |
Mission | Telecommunications |
Geostationary orbit | 91.5°E |
Launch vehicle | Zenit Land Launch #3 |
Prime contractor | OSC |
Platform | Star-2 |
Mass at launch | 2366 kg |
Dry mass | |
Dimension | |
Solar array | |
Stabilization | 3-axis |
DC power | 3600 W |
Design lifetime | 15 years |
Main transponders | 12 |
Backup transponders | 3 |
Power | 60 W |
Bandwidth | 36 MHz |
Coverage | global single beam covering Eastern Africa, The Middle East, Asia and Australia |
EIRP max | 41 dBW |
G/T max | +0.8 dB/K |
Polarization | linear |
Frequencies |
Uplink:
5.925-6.425 GHz Downlink: 3.700-4200 GHz |
Main transponders | 12 |
Backup transponders | 3 |
Power | 120 W |
Bandwidth | 36 MHz |
Coverage |
Indonesian
beam Malaysian beam |
EIRP max |
Malaysian:
58 dBW Indonesian: 55 dBW |
G/T max |
Malaysian:
+12.7 dB/K Indonesian: +9.6 dB/K |
Polarization | linear |
Frequencies |
uplink:
13.75-14.25 GHz downlink: 12.20-12.50 GHz |