Designation | 29516 / 06048A |
Launch date | 28 Oct 2006 |
Country of origin | China |
Mission | Telecommunications |
Geostationary orbit | 92.2°E |
Launch vehicle | Long March #90 |
Out of service | 1 Nov 2006 |
Cause | Solar panel total failure |
Prime contractor | CAST |
Platform | DFH4 |
Mass at launch | 5100 kg |
Mass in orbit | |
Dimension | |
Solar array | |
Stabilization | |
DC power | 10 kW |
Design lifetime | 12/15 years |
Main transponders | 22 |
Backup transponders | |
Power | 150 W |
Bandwidth |
18×36
MHz 4×54 MHz |
Coverage | China and neighboring regions |
EIRP max | 57.5 dBW |
G/T max | 7.5 dB/K |
Polarization | circular R/L |
Right
HCP Uplink |
Right
HCP Downlink | Transponder |
Left
HCP Downlink |
Left
HCP Uplink | Bandwidth (MHz) |
17.330 | 1A | 11.730 | 54 | ||
11.750 | 1B | 17.350 | 54 | ||
17.390 | 2A | 11.790 | 54 | ||
11.810 | 2B | 17.410 | 54 | ||
17.440 | 3A | 11.840 | 36 | ||
11.860 | 3B | 17.460 | 36 | ||
17.480 | 4A | 11.880 | 36 | ||
11.900 | 4B | 17.500 | 36 | ||
17.520 | 5A | 11.920 | 36 | ||
11.940 | 5B | 17.540 | 36 | ||
17.560 | 6A | 11.960 | 36 | ||
11.980 | 6B | 17.580 | 36 | ||
17.600 | 7A | 12.000 | 36 | ||
12.020 | 7B | 17.620 | 36 | ||
17.640 | 8A | 12.040 | 36 | ||
12.060 | 8B | 17.660 | 36 | ||
17.680 | 9A | 12.080 | 36 | ||
12.100 | 9B | 17.700 | 36 | ||
17.720 | 10A | 12.120 | 36 | ||
12.140 | 10B | 17.740 | 36 | ||
17.760 | 11A | 12.160 | 36 | ||
12.180 | 11B | 17.780 | 36 |